In general House building Commercial facilities Energy saving Regenerative sources
 
 
 
  Office and administration buildings

Reconversion and change of use of high rise apartments in Ziolkowskistraße 9 to a bank with fewer residential floors

Heating
- heating produced by a biomass boiler
wood pellets (215 kW)
- separate heating circuits for bank, residential
quarters and ventilation
- horizontal distribution
- flat radiators and convectors in the
glass façade area

Sanitary
- higher medium standard sanitary fittings
- central water heating
- pressurisation and fire extinguisher installation

Electrical
- medium standard lighting, installations, fire alarm,
house alarm and video observation installations
- emergency lighting and back up power plant
(100 KvA)
- structured wiring, telephone and BK installations
- electrical operation of exterior blinds
- RWA plant, elevator and lightning conductor

 
 
Status   Perspective
Ventilation
- Extraction and ventilation plants with heat recovery
- decentralised cooling for server rooms
- decentralised extraction for the toilet rooms
- mechanical smoke extraction

Contractor: DKB
Planning: BBP Bauconsulting
Period: 2001