In general House building Commercial facilities Energy saving Regenerative sources
 
 
 
  Karlsruhe, Heidstücker-Siedlung

Bernsteinstraße / Edelbergstraße
Heating supply with BHKW
(combined heating and power station)

9 dwellings with 3 to 4 floors each
and approx. 14.016 m2 of floor area

Renovation the heating, sanitary
and electrical installations,
installation of ventilation plants
with heat recovery, variant central
tributary station with central water heating in each building

Central heating installation
Heating requirement: 40 W/m2
Overall heat output: 521 kW
Modules of a combined heating and power station:
Electrical performance: 1 x 50 kW
Thermal performance: 1 x 97 kW
Thermal value of heat exchanger: 1x 116 kW
Peak load boiler, low temperature : 1 x 405 kW

Proximity heating network
Marked-out route length of cellar: 137 m
Marked-out route length outside: 296 m
Laying depth: 1,0 m

 
 
Extension with central heating plant  
Combined heating and
power station
Buffer tank
Contractor: Volkswohnung GmbH
Planning: BBP Bauconsulting mbH
Site supervision: BBP Bauconsulting mbH
Building period: 2003 / 2004