| |
Tallinner / Vidiner Straße
Schwerin, Neu-Zippendorf
District development
Contractor: WGS e.G., SWG e.G.
Architect: Dipl.-Arch. A. Köppen
Planning: 2002 until 2005
Completion: Beginning of 2003
Planning services: general planning with
architecture, building physics,
stress analysis, utilities and
structural inspections
Building type: WBS 70 – GB, 5 storeys
Number of apartments: WGS – 290 SWG – 300
Number of apartments after alterations:
WGS – 42 SWG – 148
Building costs: 11.7 mio


|
|
 |
|
Measures:
Redesign of enclosed, compact living accommodation to an area with a completely new image and economical approach to the minimisation of the number of apartments and elimination of existing vacant properties by:
· dismantling of complete building segments
· dismantling roof space over the 3rd. and 4th. upper
storeys in designated areas
· measures to improve the quality of the housing by:
· variety of ground plans with blueprint alterations
· dormer extensions
· installation of elevators
· terraces
· renovation of the façades
|
|